Bulk feed silos and transport route
← EquipmentIntegrated systems / Core equipment

Feed silo and main feed lineFeed silo and main feed line

Bulk storage, replenishment and feed transfer are sized from daily consumption, delivery cycle and house positions. Silo foundations, outlet, auger and bends form one route to the cage or pan feeder.

Product catalogue visual
ApplicationIntegrated systems
Selection starts withDaily feed use, refill interval and truck type
Project routeExplore the solution ↗
01 / Overview

Feed silo and main feed line

Bulk storage, replenishment and feed transfer are sized from daily consumption, delivery cycle and house positions. Silo foundations, outlet, auger and bends form one route to the cage or pan feeder.

01

Storage sizing

Capacity is checked against feed density, daily intake, refill interval and local delivery constraints.

02

Mechanical route

Auger distance, lift, bends and outlets are planned with the house rows before foundation work.

03

Service access

Ladder, discharge, rainproof top and foundation access are included in the silo position.

02 / Equipment details

See each equipment detail in context.

Each catalogue image explains a visible structure or process; pictured configurations are not a fixed supply list.

Bulk feed silos and transport route
Product catalogue visual / 01
01 / Equipment details

Silo and house position

The cover shows outdoor silos and transfer pipes. Silo count and rated tonnage cannot be inferred from the image; they follow daily consumption, refill cycle and house count.

Configure for your site:Fix foundations, truck access, line direction and service clearance.
Galvanized silo battery
Product catalogue visual / 02
02 / Equipment details

Galvanized silo example

The source silo group shows the relative form of the shell, cone and supports. Final material, volume and foundation loads belong in the technical specification.

Configure for your site:Confirm rated tonnage, foundation load and outlet height.
Auger and bend detail
Product catalogue visual / 03
03 / Equipment details

Elbow and line connection

The detail page focuses on a feed-line elbow. The elbow, main line and house entry affect access and blockage recovery and must follow the real route.

Configure for your site:Confirm pipe diameter, bends, house penetration and service area.
03 / System connections

How the equipment connects.

Functional connection map · not a construction drawing

01

Bulk feed delivery

Truck delivery reaches the silo inlet.

02

Silo and cone

Storage and discharge follow daily demand.

03

Main line to house

Transfer through the main line to in-house distribution.

05 / Catalogue references

Catalogue references

Catalogue reference figures. Confirm the selected configuration and applicable local requirements before order.

ModelRated tonnageDiameterHeightVolume
XF1803 t约 1.8 m约 4.1 m约 4.5 m³
XF3804.5 t约 1.8 m约 5.0 m约 7 m³
XF2758 t约 2.75 m约 5.3 m约 13.5 m³
06 / Configuration scope

Turn a product family into a project specification.

Final model and supply scope are set in a written project specification.

Information to share

  1. 01Daily feed use, refill interval and truck type
  2. 02Silo tonnage, foundation and drainage
  3. 03Line length, elbows and house entry

Connected equipment

Final model and supply scope are set in a written project specification.

07 / Questions buyers ask

Questions buyers ask

Can catalogue figures be used directly in a quotation?

Catalogue reference figures. Confirm the selected configuration and applicable local requirements before order.

Which systems can be configured together?

Review the related equipment above and share your automation goals. The written technical scope defines the final combination.

What house information should I share?

Daily feed use, refill interval and truck type;Silo tonnage, foundation and drainage;Line length, elbows and house entry

08 / Next step

Share your project conditions. Define the right configuration.

Final model and supply scope are set in a written project specification.