Talk to us about your project✉ mengxinhu00@gmail.comWhatsApp · +86 180 7241 4213
CAGENOVA.ENGINEERED EQUIPMENT
Request a plan ↗
Multi-tier duck housing reference
← EquipmentLayer duck / Core equipment

Layer duck cage systemLayer duck cage system

Duck housing needs a larger body envelope, different drinking behaviour, a foot-friendly floor and a reliable egg route. Water, manure and ventilation interfaces carry more weight in selection than cage appearance alone.

Product catalogue visual
ApplicationLayer duck
Selection starts withDuck breed, weight and production stage
Project routeExplore the solution ↗
01 / Overview

Layer duck cage system

Duck housing needs a larger body envelope, different drinking behaviour, a foot-friendly floor and a reliable egg route. Water, manure and ventilation interfaces carry more weight in selection than cage appearance alone.

01

Body and feet

Cage height, depth and floor contact points are checked against duck breed, age and target density.

02

Wet-house control

Drinking-line pressure and splash control are coordinated with belt cleaning and exhaust.

03

Egg route

Roll-out slope, belt transfer and egg-room connection are reviewed for intact, clean eggs.

02 / Equipment details

See each equipment detail in context.

Each catalogue image explains a visible structure or process; pictured configurations are not a fixed supply list.

Multi-tier duck housing reference
Product catalogue visual / 01
01 / Equipment details

Layer-duck row reference

The cover photograph shows a tiered duck row. Duck body size, foot support and moisture from drinking differ from chickens and require a separate configuration review.

Configure for your site:Confirm duck size, floor contact and cleaning access per tier.
Duck cage row and water access
Product catalogue visual / 02
02 / Equipment details

Water line and cage front

The supplied page places the water line beside the cage front and discusses hygiene. The image is a position reference; splash, drainage and manure-belt wetting must be reviewed for the project.

Configure for your site:Confirm water supply, splash collection and moisture removal.
Manure and ventilation interface
Product catalogue visual / 03
03 / Equipment details

End access and ventilation service

The supplied page links ventilation openings, end access and equipment service. Moisture control is a house system issue and must be coordinated with manure removal and exhaust.

Configure for your site:Confirm end access, exhaust capacity and manure route.
03 / System connections

How the equipment connects.

Functional connection map · not a construction drawing

01

Water and feed

Serve the duck row according to feeding behavior.

02

Duck cages and egg edge

Review body space, foot support and egg transition.

03

Moisture and manure

Connect to ventilation and outside waste route.

06 / Configuration scope

Turn a product family into a project specification.

Final model and supply scope are set in a written project specification.

Information to share

  1. 01Duck breed, weight and production stage
  2. 02Splash, floor support and drainage
  3. 03Duck-egg collection, manure route and exhaust

Connected equipment

Final model and supply scope are set in a written project specification.

07 / Questions buyers ask

Questions buyers ask

Can catalogue figures be used directly in a quotation?

Catalogue reference figures. Confirm the selected configuration and applicable local requirements before order.

Which systems can be configured together?

Review the related equipment above and share your automation goals. The written technical scope defines the final combination.

What house information should I share?

Duck breed, weight and production stage;Splash, floor support and drainage;Duck-egg collection, manure route and exhaust

08 / Next step

Share your project conditions. Define the right configuration.

Final model and supply scope are set in a written project specification.