Duck housing needs a larger body envelope, different drinking behaviour, a foot-friendly floor and a reliable egg route. Water, manure and ventilation interfaces carry more weight in selection than cage appearance alone.
Duck housing needs a larger body envelope, different drinking behaviour, a foot-friendly floor and a reliable egg route. Water, manure and ventilation interfaces carry more weight in selection than cage appearance alone.
01
Body and feet
Cage height, depth and floor contact points are checked against duck breed, age and target density.
02
Wet-house control
Drinking-line pressure and splash control are coordinated with belt cleaning and exhaust.
03
Egg route
Roll-out slope, belt transfer and egg-room connection are reviewed for intact, clean eggs.
02 / Equipment details
See each equipment detail in context.
Each catalogue image explains a visible structure or process; pictured configurations are not a fixed supply list.
Product catalogue visual / 01
01 / Equipment details
Layer-duck row reference
The cover photograph shows a tiered duck row. Duck body size, foot support and moisture from drinking differ from chickens and require a separate configuration review.
Configure for your site:Confirm duck size, floor contact and cleaning access per tier.
Product catalogue visual / 02
02 / Equipment details
Water line and cage front
The supplied page places the water line beside the cage front and discusses hygiene. The image is a position reference; splash, drainage and manure-belt wetting must be reviewed for the project.
Configure for your site:Confirm water supply, splash collection and moisture removal.
Product catalogue visual / 03
03 / Equipment details
End access and ventilation service
The supplied page links ventilation openings, end access and equipment service. Moisture control is a house system issue and must be coordinated with manure removal and exhaust.
Configure for your site:Confirm end access, exhaust capacity and manure route.
03 / System connections
How the equipment connects.
Functional connection map · not a construction drawing
01
Water and feed
Serve the duck row according to feeding behavior.
→
02
Duck cages and egg edge
Review body space, foot support and egg transition.
→
03
Moisture and manure
Connect to ventilation and outside waste route.
06 / Configuration scope
Turn a product family into a project specification.
Final model and supply scope are set in a written project specification.